All guides

Solcius and Sunworks Closed: Who Services Their Solar Systems in California Now?

Solcius LLC filed Chapter 7 on February 5, 2024 — its CSLB contractor license expired and is now revoked, and its installer warranty is gone. Here is exactly what California homeowners must do now to keep their systems running.

By Taylor Crouse — Founder, Helios Energy GlobalPublished

Quick answer

  • Sunworks Inc. and its residential arm Solcius LLC filed Chapter 7 in the U.S. Bankruptcy Court for the District of Delaware on February 5, 2024 (Solcius case no. 24-10216).
  • Solcius's CSLB contractor license (#976336) expired September 30, 2024 and is now revoked — per the CSLB record current as of November 13, 2026.
  • The installer workmanship warranty is void; panel, inverter, and battery manufacturer warranties survive and are still enforceable directly with the maker.
  • In March 2025, EnergyAid acquired Solcius and Sunworks customer data and monitoring sites — it offers paid service and monitoring, but it did not assume the original warranties.
Solcius and Sunworks Closed: Who Services Their Solar Systems in California Now?

Solcius LLC's Chapter 7 petition was filed on February 5, 2024 — the same day the entire company ceased operations — and the case sits in the U.S. Bankruptcy Court for the District of Delaware as case no. 24-10216. That single filing date is the line between "your installer exists" and "your installer is gone": no workmanship or labor warranty survives it, and the proof-of-claim deadline for creditors (June 17, 2024) has already passed. The good news is that your panels, inverter, and any battery carry manufacturer warranties that are completely independent of Solcius and remain in force.

Last verified: November 2026 by Helios Energy Global.


What the court record actually says

On February 5, 2024, Sunworks, Inc. and three of its subsidiaries ceased operations and filed voluntary petitions for relief under Chapter 7 of Title 11 of the United States Code in the U.S. Bankruptcy Court for the District of Delaware.

Solcius LLC is case no. 24-10216.

A Chapter 7 trustee was appointed by the Bankruptcy Court and assumed control over the assets and liabilities of the company, effectively eliminating the authority and powers of the Board of Directors and its executive officers to act on behalf of the company.

Jeoffrey Burtch was appointed as Chapter 7 trustee.

Sunworks had expanded its national footprint by acquiring residential contractor Solcius in 2021. When Sunworks went down, Solcius went with it — there was no buyer for the operating business and no successor installer.

What Chapter 7 means for you, in plain English: Chapter 7 is liquidation, not reorganization. As stated in the filing, Sunworks' assets "will be liquidated" and all executives transferred company authority to the bankruptcy court. There is no reorganized Solcius that will answer the phone, honor a warranty, or send a technician.


Your installer warranty: gone. Your equipment warranties: still alive.

This is the most important distinction for any Solcius customer.

Installer (workmanship/labor) warranty: The workmanship and labor warranty is void. Manufacturer warranties, however, continue. No entity has assumed Solcius's contractual obligations to you as a homeowner.

Manufacturer warranties: Your solar panels, inverter, and battery were warranted by the manufacturers — not by Solcius. Those warranties travel with the equipment, not the installer. Common manufacturers whose products Solcius used include SolarEdge (inverters) and various panel brands. To enforce a manufacturer warranty, you contact the manufacturer directly and arrange for a licensed contractor to perform any covered repair.

EnergyAid — what it is and what it isn't: EnergyAid announced in March 2025 that it acquired Sunworks and Solcius intellectual property, and the acquisition includes customer data and monitoring sites, which will enable EnergyAid to proactively monitor and maintain solar systems.

While the acquisition enables EnergyAid to service many former systems, it is not a continuation of Solcius as a company, and EnergyAid did not assume Sunworks' or Solcius' historical liabilities or contractual responsibilities. Think of EnergyAid as a new, independent service provider — useful, but not your old warranty.

A California service company acquired Sunworks' and Solcius' customer data and monitoring platforms and offers paid maintenance plans. That can be a fine option — just know it's a subscription service, not your old warranty, and you're free to have any licensed contractor service a system you own.


Solcius in Southern California: where it sold

Solcius's service areas extended across Arizona, California, Colorado, Minnesota, New Mexico, Nevada, South Carolina, Texas, and Wisconsin. Within California, the Solcius shutdown stranded thousands of customers, particularly across key regions like Arizona, California, Nevada, and New Mexico. BuildZoom's permit records show Solcius pulled 167 permitted projects across California, with documented activity in Los Angeles, Riverside, San Bernardino, and the broader Inland Empire — all served by Southern California Edison (SCE) or LADWP, depending on the exact address.

Why your utility matters now: If your home is on SCE, you are on NEM 3.0 (the Net Billing Tariff) if your system was interconnected after April 15, 2023. If you were interconnected before that date, you are grandfathered on NEM 2.0 for 20 years from your approval date — and keeping that grandfathered status is a strong reason to maintain your system properly rather than let it sit unmonitored. If your home is served by LADWP, you are on LADWP's own retail-rate net metering program, which is not NEM 3.0. Either way, a system that isn't monitored and producing is a system that isn't offsetting your bill.


Solcius's California contractor license: revoked

Per the CSLB, Solcius LLC's contractor license #976336 expired September 30, 2024, and the license is revoked and not able to contract at this time.

The license was revoked after expiration.

This matters for one practical reason: anyone who calls you claiming to be Solcius or to be operating under Solcius's license is misrepresenting themselves. You can verify any contractor's current license status at cslb.ca.gov. In California, solar work requires an active C-46 Solar Contractor license, a C-10 Electrical Contractor license, or a Class B General Building Contractor license. Unlicensed contracting draws real CSLB enforcement actions.


The five steps every Solcius customer in California should take now

Step 1 — Locate your loan or lease servicer

Your financing contract was almost certainly held by a third-party lender or lease company — not Solcius. Common lenders used by Solcius include Mosaic, GoodLeap, and Sunlight Financial. Your monthly statement or original contract packet will name the servicer. Note: Mosaic filed for bankruptcy in June 2025; in September 2025 a loan servicing company agreed to buy Mosaic and said borrowers' payment terms and schedules would stay the same. If your loan was with Mosaic, contact the successor servicer named in any notice you received. If you have a lease or PPA, the lease company — not Solcius — owns the panels, and you should contact them about any service issues.

Step 2 — Take over your monitoring account

If Solcius set up a SolarEdge, Enphase, or other monitoring portal for your system, that account is tied to your inverter's serial number — not to Solcius's business account. If your system's monitoring has been affected, EnergyAid may be able to restore access for eligible customers using the monitoring assets and customer records it acquired from Solcius. You can also contact your inverter manufacturer directly (SolarEdge or Enphase) and claim the monitoring account using your system's serial number and your address.

Step 3 — Register your manufacturer warranties directly

Pull out your original install documents and locate the panel model, inverter model, and any battery model. Then register each warranty with the manufacturer:

  • Panels: Most major panel brands (REC, Silfab, Q CELLS, Canadian Solar) allow homeowner warranty registration online. A 25-year product and performance warranty is standard and survives the installer's closure.
  • Inverters: SolarEdge and Enphase both allow warranty transfer or registration by the homeowner. Have your serial number and installation date ready.
  • Battery: If your system includes a battery, register it with the manufacturer (Tesla, Enphase, Franklin, etc.) directly.

See our solar panel warranties explained guide for model-by-model details on what each manufacturer covers and how to file a claim.

Step 4 — Verify the license of any contractor you hire

Before you let anyone work on your system, check their CSLB license at cslb.ca.gov. Confirm the license is active, that it carries a C-46, C-10, or Class B classification, and that the bond and workers' compensation are current. Use the CSLB Check a License tool at cslb.ca.gov and search the exact business name or license number on your contract. Never hire based on a door-knock or a claim to be a "Solcius successor."

Step 5 — Arrange independent inspection and repair

If your system has been unmonitored or underperforming, start with a diagnostic inspection by a licensed, independent solar contractor. A full inspection will check string output, inverter error codes, racking integrity, roof penetration seals, and interconnection equipment. If something is broken and it falls under a manufacturer warranty, the manufacturer will typically require a licensed contractor to perform the repair and submit documentation. If the issue is workmanship — a wiring error, a leak from a penetration, a poorly seated connector — that cost is yours to bear, because the Solcius workmanship warranty is gone.

If you're not sure where to start, see our solar panels not working: what to check guide for a step-by-step self-diagnostic before you call anyone. For hands-on service in Southern California, Helios offers solar repair and maintenance by licensed technicians across the SCE and LADWP service territories.


Key numbers for Solcius customers in California

Item Detail
Filing date February 5, 2024
Court U.S. Bankruptcy Court, District of Delaware
Sunworks case no. 24-10215
Solcius LLC case no. 24-10216
Chapter 7 (liquidation)
Trustee Jeoffrey L. Burtch
Proof-of-claim deadline June 17, 2024 (passed)
Solcius CSLB license #976336 Expired 09/30/2024 — now revoked (CSLB data: 11/13/2026)
Installer workmanship warranty Void as of February 5, 2024
Panel/inverter manufacturer warranties Survive — register directly with maker
EnergyAid monitoring/service Available as paid subscription (not a warranty) — acquired Solcius IP March 2025
SGIP battery incentive (CA) Residential budget waitlisted in 2026 — apply to get on the list
SCE peak rate (4–9 PM) ~48–58¢/kWh — every hour your system is down costs real money
LADWP effective rate ~28¢/kWh (26–31¢ effective range)

Warranty status and license data are estimates based on publicly available records. Confirm your specific equipment warranty terms with each manufacturer.


How this compares to the Titan Solar Power situation

If you have neighbors who were Titan Solar Power customers, the situation is structurally similar: a Chapter 7 filing, a voided installer warranty, and surviving manufacturer warranties. In 2025, EnergyAid took over customer accounts and monitoring platforms from four large residential solar brands: Sunworks, Solcius, Titan Solar Power, and Suntuity Renewables. The steps are the same regardless of which installer closed. See our full guide: Titan Solar Power closed: who services Titan systems in California.


Frequently asked questions about Solcius solar service in California

Is Solcius still in business in California?

No. On February 5, 2024, Sunworks, Inc. and three of its subsidiaries — including Solcius LLC — ceased operations and filed voluntary petitions for Chapter 7 relief in the U.S. Bankruptcy Court for the District of Delaware. The CSLB shows Solcius's California contractor license as revoked as of November 2026. There is no operating Solcius entity.

Does my Solcius warranty still apply?

The installer workmanship and labor warranty does not apply — it ended when Solcius ceased operations on February 5, 2024. The workmanship and labor warranty is void, but manufacturer warranties continue. Contact your panel and inverter manufacturers directly to confirm your coverage and register your equipment if you haven't already.

Who took over Solcius customer accounts?

EnergyAid announced in March 2025 that it acquired Sunworks and Solcius intellectual property; the acquisition includes customer data and monitoring sites, enabling EnergyAid to proactively monitor and maintain solar systems.

EnergyAid did not assume Sunworks' or Solcius' historical liabilities or contractual responsibilities. Their service is available for a fee — it is not a free continuation of your old warranty.

Can any licensed contractor service my Solcius system?

Yes. You are free to have any licensed contractor service a system you own. In California, the contractor needs an active CSLB C-46, C-10, or Class B license. Always verify the license at cslb.ca.gov before any work begins. Your system belongs to you (or your lease company) — Solcius's closure does not restrict who can work on it.

My Solcius system is on SCE — does NEM 3.0 affect my service options?

NEM 3.0 (the Net Billing Tariff) governs how SCE credits your exported energy — it has no effect on who can service your physical system. Any licensed contractor can repair or maintain your panels and inverter regardless of your tariff. What matters is keeping the system producing: SCE's peak rate runs approximately 48–58¢/kWh between 4 and 9 PM, so every day a fault goes unaddressed is a real bill impact. See our NEM 3.0 explained guide for how the tariff works.

My Solcius system is on LADWP — is my situation different?

LADWP is a municipal utility and is not on NEM 3.0. LADWP customers remain on LADWP's own retail-rate net metering program, which credits exported solar at the full retail rate (approximately 28¢/kWh effective). The steps to find a new service contractor are identical to SCE customers. The financial urgency to keep your system running is just as real.

Should I add a battery now that Solcius is gone and I need to hire a new contractor anyway?

If you're already bringing in a licensed contractor for an inspection or repair, it's a natural time to get a battery assessment done in the same visit. A battery adds backup power and — on SCE's NEM 3.0 — lets you shift solar energy to the 4–9 PM peak window instead of exporting it at low credit rates. See our batteries page for current options and the solar vs. battery under NEM 3.0 guide for Southern California-specific math. SGIP residential incentive budgets are waitlisted in 2026 — apply now to hold your place in line.


Next steps

Get a free consultation and custom design.

No pressure, no obligation — the owner reviews every design we send.